{"product_id":"pet-leashes-rope-outdoor-training-running-dog-leash-belt-dogs-lead-for-small-and-large-dog-long-lead-training-leash-long-line-dog-leash-great-for-dog-puppy","title":"Pet Leashes Rope Outdoor Training Running Dog Leash Belt  Dogs Lead For Small And Large Dog Long Lead-Training Leash\/Long Line Dog Leash Great for Dog\/Puppy","description":"\u003cp\u003e \u003cstrong\u003eDescription:\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e\n\u003cli\u003e\u003cspan class=\"a-list-item\"\u003e\u003cstrong\u003eLIGHTWEIGHT AND NOT ABSORB WATER-\u003c\/strong\u003e Soft and lightweight; Non-absorbent material wont get more and more heavy in the water and wont sink, the long dog leash will float when submerged and highly visible against any background\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan class=\"a-list-item\"\u003e\u003cstrong\u003eGREAT DESIGN-\u003c\/strong\u003e The stitching is reinforced and the nickel-plated clip swivels to resist twisting; The joints of the rope are sewn by the machine, which is very strong and not easy to fall off\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLONG DOG LEAD-\u003c\/strong\u003e  Also Great for Camping, Hunting, Hiking, Backyard, Beach Play, and other activities. Sturdy, strong and firm control of any dogs\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eBrand Name:\u003c\/strong\u003e STEVVEX Pets\u003cbr\u003e \u003cstrong\u003eModel Number:\u003c\/strong\u003e ST12DB786GBI\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eType\u003c\/strong\u003e: Leashes\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eDog Leash Type:\u003c\/strong\u003e Basic Leashes\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eMaterial:\u003c\/strong\u003e Nylon\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eType:\u003c\/strong\u003e Dogs\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eSeason:\u003c\/strong\u003e All seasons\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003ePattern:\u003c\/strong\u003e Solid\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eFeature:\u003c\/strong\u003e Personalized\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eFeature:\u003c\/strong\u003e outdoor training dog leash rope\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eUse for:\u003c\/strong\u003e puppy, small medium and large dog belt\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eUse for 1:\u003c\/strong\u003e training, running dog lead\u003c\/span\u003e\u003c\/p\u003e","brand":"Stevvex","offers":[{"title":"Black \/ S 1.5m","offer_id":53958475022700,"sku":"42288796-black-s-1-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Black \/ XS 1.2m","offer_id":53958475055468,"sku":"42288796-black-xs-1-2m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Black \/ L 3m","offer_id":53958475088236,"sku":"42288796-black-l-3m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Black \/ M 1.8m","offer_id":53958475121004,"sku":"42288796-black-m-1-8m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Black \/ XL 4.5m","offer_id":53958475153772,"sku":"42288796-black-xl-4-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Black \/ 2XL 6m","offer_id":53958475186540,"sku":"42288796-black-2xl-6m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Black \/ 3XL 10m","offer_id":53958475219308,"sku":"42288796-black-3xl-10m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ S 1.5m","offer_id":53958475252076,"sku":"42288796-green-s-1-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ XS 1.2m","offer_id":53958475284844,"sku":"42288796-green-xs-1-2m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ L 3m","offer_id":53958475317612,"sku":"42288796-green-l-3m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ M 1.8m","offer_id":53958475350380,"sku":"42288796-green-m-1-8m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ XL 4.5m","offer_id":53958475383148,"sku":"42288796-green-xl-4-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ 2XL 6m","offer_id":53958475415916,"sku":"42288796-green-2xl-6m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Green \/ 3XL 10m","offer_id":53958475448684,"sku":"42288796-green-3xl-10m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ S 1.5m","offer_id":53958475481452,"sku":"42288796-red-s-1-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ XS 1.2m","offer_id":53958475514220,"sku":"42288796-red-xs-1-2m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ L 3m","offer_id":53958475546988,"sku":"42288796-red-l-3m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ M 1.8m","offer_id":53958475579756,"sku":"42288796-red-m-1-8m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ XL 4.5m","offer_id":53958475612524,"sku":"42288796-red-xl-4-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ 2XL 6m","offer_id":53958475645292,"sku":"42288796-red-2xl-6m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Red \/ 3XL 10m","offer_id":53958475678060,"sku":"42288796-red-3xl-10m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ S 1.5m","offer_id":53958475710828,"sku":"42288796-blue-s-1-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ XS 1.2m","offer_id":53958475743596,"sku":"42288796-blue-xs-1-2m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ L 3m","offer_id":53958475776364,"sku":"42288796-blue-l-3m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ M 1.8m","offer_id":53958475809132,"sku":"42288796-blue-m-1-8m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ XL 4.5m","offer_id":53958475841900,"sku":"42288796-blue-xl-4-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ 2XL 6m","offer_id":53958475874668,"sku":"42288796-blue-2xl-6m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Blue \/ 3XL 10m","offer_id":53958475907436,"sku":"42288796-blue-3xl-10m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ S 1.5m","offer_id":53958475940204,"sku":"42288796-pink-s-1-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ XS 1.2m","offer_id":53958475972972,"sku":"42288796-pink-xs-1-2m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ L 3m","offer_id":53958476005740,"sku":"42288796-pink-l-3m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ M 1.8m","offer_id":53958476038508,"sku":"42288796-pink-m-1-8m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ XL 4.5m","offer_id":53958476071276,"sku":"42288796-pink-xl-4-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ 2XL 6m","offer_id":53958476104044,"sku":"42288796-pink-2xl-6m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Pink \/ 3XL 10m","offer_id":53958476136812,"sku":"42288796-pink-3xl-10m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ S 1.5m","offer_id":53958476169580,"sku":"42288796-fruit-green-s-1-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ XS 1.2m","offer_id":53958476202348,"sku":"42288796-fruit-green-xs-1-2m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ L 3m","offer_id":53958476235116,"sku":"42288796-fruit-green-l-3m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ M 1.8m","offer_id":53958476267884,"sku":"42288796-fruit-green-m-1-8m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ XL 4.5m","offer_id":53958476300652,"sku":"42288796-fruit-green-xl-4-5m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ 2XL 6m","offer_id":53958476333420,"sku":"42288796-fruit-green-2xl-6m","price":17.99,"currency_code":"USD","in_stock":true},{"title":"Fruit-green \/ 3XL 10m","offer_id":53958476366188,"sku":"42288796-fruit-green-3xl-10m","price":17.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0979\/6032\/9580\/files\/pet-leashes-rope-outdoor-training-running-dog-leash-belt-dogs-lead-672.webp?v=1782529447","url":"https:\/\/thisandthatshoppe-2.myshopify.com\/fr\/products\/pet-leashes-rope-outdoor-training-running-dog-leash-belt-dogs-lead-for-small-and-large-dog-long-lead-training-leash-long-line-dog-leash-great-for-dog-puppy","provider":"ThisandThatShoppe","version":"1.0","type":"link"}