1
/
de
1
Stevvex
2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
2 Color Retractable Dual Double Pet Leash Rope Walk For Dog Long Lead-Training Pet Leash Pet Tractor Small And Medium Dog Cat
Prix habituel
$59.00 USD
Prix habituel
$55.00 USD
Prix promotionnel
$59.00 USD
Frais d'expédition calculés à l'étape de paiement.
Quantité
Impossible de charger la disponibilité du service de retrait
Description:
- DURABILITY AND SAFETY- This dog training leash is made of sturdy nylon, which is durable and perfectly protects your dog. Chrome-plated hooks enhance 360° rotation at the joint.
- COMFORTABLE HANDLE- The ergonomic non-slip handle is easy to grasp and provides a pleasant walking experience for your pet, without worrying that the dog leash will hurt your hand.
- EASY TO USE- Quick lock, pause and unlock buttons-easy to operate with your thumb. No tangles, it is very suitable for walking, jogging, running, camping and hiking, or going out for a leisurely stroll in the backyard.
Brand Name: STEVVEX Pets
Model Number: ST12DB767QWS
Type: Leashes
Dog Leash Type: Double Leashes
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: LIGHTS
Partager
